On to the other side
I completed the the benchwork for the Denton and Geraldine levels. Added the foam sub-base for the track on the opposite side of the tunnel/bridge area.
Here is a closer view.
Over the Bridge and Through the Woods…
I experimented with using a piece of aluminum channel for the bridge support. This bridge will be typical of the ballasted deck bridges that the Milwaukee used on this line.
This type of bridge construction was from a video I saw Tony Koester do for the "Dream, Plan, Build" series from Model Railroader. The aluminum channel provides a solid base for the bridge deck and ensures that the bridge is straight and level.
No comments:
Post a Comment