Layout Construction - October 12, 2009

Tunnel Construction
Now that all of the benchwork is secure and the pink foam is glued down, it was time to concentrate on the bridge/tunnel area. I added the supports for the bottom of the creek and top of the tunnel.

101209 003

Now the base support for the creek is in. The tunnel area will need to be finished before the bridge can be built. The tunnel will feature a half tunnel wall to hide the background. In the foreground, the fascia board will cover the center section leaving two access holes to the tunnel track on either side.

101209 004

A view through the east tunnel entrance. The pegboard masonite will be covered and not visible after the scenery is put in. At this point the cork roadbed has glued down, but the track has not been set.

101209 005

I Can See the Light
I also installed the under cabinet lights for the lower level. A scrap piece of peg board was used to test the height of the fascia. I was concerned about the fascia covering the lights and being small enough to not block the view of the lower level. It looks like during work and operating times a stool will be required. I used 23" under cabinet lights that are inter-connected from Walfart. A good deal at only $9 a piece. There is a limit of 5 connected lights.

101209 009

A view of the lower level lights with the main room lights off.