Sunday, October 18, 2009

Layout Room Construction - September 13, 2009

If you don’t like it, hide it
The enclosure for the furnace and water heater is finally finished. The panels are locked into position at the top and bottom. These panels can be removed to service the equipment.

091309 002

On the layout, I installed shelf brackets on the Denton and Geraldine side of the layout. I also cut the baseboard for the bench work.

091309 004

No comments:

Post a Comment