Friday, October 16, 2009

Layout Construction - June 24, 2009

Benchwork for the Falls yard (upper level) and Lewistown (lower level) is now built. I dug out building from a previous layout to see how it would look. After months (years actually) of planning, I just had to set out some rolling stock and track to get that layout feel.  

 063009 005

063009 006 063009 007

This view shows the brackets that will hold the benchwork for the bridge (upper level) and the tunnel (lower level) over the fireplace.

063009 012

No comments:

Post a Comment