Milwaukee Road NW2 switcher mid-train headed west in Harlowton, Montana yard during the mid 70’s.
Sunday, December 29, 2013
Snapshot Sunday - #3
Saturday, December 28, 2013
Layout Construction - #18
Update to the Montana Grain Elevator
I have been working on the grain elevator located in Geraldine. The roof for the annex building is finished and I added the extension pipe from the head housing to the roof of the annex. Decals and weathering have also been added. I am pleased with the results so far, with the exception for some of the decals that I created. If you click on the photo to enlarge it, you will see what I mean. The decals were created using HobbyCal decal paper from Model Train Software. The decal paper is too thick to produce some styles of signs. It worked great for the Sapphire/Ceretana sign. The Montana Elevator Company sign did not work as anticipated. If the light hits the sign in a certain way the thickness is not that noticeable. The company sign will probably be removed at a later date and another attempt will be made with custom printed decals. The weathering is a combination of chalks and acrylic craft paint. Just enough to give the building age but not as if it were ready to fall down. The round bin on the left hand side is a place holder from another elevator in Denton. I just haven’t gotten around to ordering one for the elevator. After it is built an additional pipe we’ll be brought down from the head house to the top of the bin roof.
Click on the photos for a larger view.
Monday, December 23, 2013
Sunday, December 22, 2013
Sunday, December 15, 2013
Thursday, December 12, 2013
Layout Construction - #17
Denton Gets a Better Train Order Signal
For a long time I have wanted an operating train order signals for the Denton and Geraldine stations. Although there really isn’t much need for train order signals during the era I’m modeling, they were still present. Below is a photo of the Denton station taken during the late 70’s or early 80’s. I would love to credit the photographer, but unfortunately I don’t remember the site where I found this photo. Thanks to whoever you are. Most of the time you see train order signals located on the station or next to the operator’s bay. These signals can be easily set from inside the station. I’m not sure about the story for the Denton station. Perhaps the station was of a much larger design in the past. It may have burned down and a smaller station was constructed farther away while the old station was being demolished. A mystery yet to be solved.
I found an inexpensive alternative from J.L. Innovative Designs (photo on the left). While this made a nice stand-in for an operating signal, I really wanted something better. A trip to Warren’s Train Shop in Ogden over a year ago, I noticed they had reduced the price of a Tomar Upper Quadrant Train Order Signal which made it irresistible (photo on the right). Now that I had the signal I always wanted, how to go about getting it to operate. Looking at various sites on the internet did not produce results that made me feel comfortable with my current skill level.
The March 2012 and October 2013 issues of Model Railroad Hobbyist eZine had some great ideas for operating the train order signal using servos from Tam Valley Depot. A nice step by step article was what I needed to give me the confidence to finish this project. The servos for the semaphore arms can be controlled from either the panel switches on the fascia or by DCC remote from my NCE PowerCab. In the first photo below, you can see the control panel for the two servos mounted on the fascia board. There are controls for each semaphore, one west bound and one for east bound. The black button above each LED controls the movement. I programed the LED’s to indicate green (no orders) or red (stop for orders). The small switch to the left turns the signal light on and off. I will label everything once the fascia gets painted.
The photo on the right gives an overall view of the controls in relation to the signal position on the layout. If I had to do it over again, I would move the throttle panel over to the left more. It doesn’t bother me enough to replace the entire fascia board on this side. The photo on the right gives you a view of the servos and power for the signal LED. I used a plastic tube through the foam board and layout base to make it easier to fit the small wires for the signal. I decided to use a battery holder with two AAA batteries to power the signal LED. The light will only be on during operating sessions and I could also avoid soldering a resistor to the fine magnetic wire. If my information is correct, these signals were only lit when a train was approaching the station. Yes, I know the wiring looks like a mess. There are still some adjustments that need to be made and then I will tidy up the wires.
Thursday, December 5, 2013
Layout Construction - #16
The First Industry in Geraldine
I get scattered brained when it comes to working on the layout. I think I should work in a more logical manner. Create a list of things that need to be worked on and organize it by areas of the layout. That way you don’t miss things and you know what needs to be done first and the supplies needed to complete the task. Ya, right! That maybe how I do things in my work life. In my hobby life, when I decide to enter the train room, there are very few rules. I do whatever strikes my fancy at that moment. This is suppose to be a fun hobby. I never want it to become work. OK, enough of the soapbox!
Montana Elevator Company
The largest industry in Geraldine is the Montana Elevator. This elevator is based on the Valley Growers Association Steel Elevator from Walthers. The original kit is nice, but it is something that you see on a lot of layouts. It is time to modify the kit slightly to give it a unique appearance. The first task was to modify the width of the structure. There is not enough room from the track to edge of the layout for the entire structure including the truck unloading area. Easy enough to do. Next modification is take the extra grain storage building and add it to the main structure. After doing some research on the internet, this was a common practice as farm output increased additional storage was added. I will add additional piping from the elevator head house to the bins on the left and right. As you can see in these photos, I haven’t completed the structure. Hopefully, the next time I enter the train room, I will have more done for a future blog post! Now where did I put that box car I was building last month…..
Wednesday, December 4, 2013
Layout Construction - #15
Tunnel Scenery Completed
While looking over the last blog post, I realized I that hadn’t talked about the completion of the scenery around the tunnel portable in the helix area. For your reference you can click HERE for a review of the before photos. I will go back at a later date and add a little detail to the back drop. It won’t be much since the sky is hard to see with the upper swing bridge in place. I included a new scenery technique that I saw on Rob Spangler’s layout. Instead of the usual lichen or clump bushes, Rob creates very nice sage brush using a scouring pad and sage colored ground foam. The technique is simple and creates a nice effect. To quote Rob from a post on the Model-Railroad-Hobbyist forum;
“It's a gray scrub pad material from 3M sold as either synthetic steel wool or paint stripping pads (the latter are what I'm currently using as they are coarser). Chunks of that are sprayed with Super 77 adhesive and then coated with ASMI "Eucalyptus" coarse ground foam. Accurail "Sagebrush" foam is almost the same.”
You can click HERE to see his results in the last photo on the first page. I will include more photos of the sage brush in later posts as they keep popping up everywhere.
Sunday, December 1, 2013
Layout Construction - #14
Let There be Light!
The lower swing bridge from the layout to the helix has always had one problem. It is very dark when compared to the rest of the layout. While there is really nothing there that needs a lot of light when viewing, it still looked wrong. One day we were shopping at Costco and needed to get a pack of light bulbs to use around the house. On the lighting aisle I found these flexible LED lighting strips made by Sylvania called Mosaic. The price could not ne beat at $30 and included 8’ of lighting. If you can’t find them at Costco, Lowes also sells them for higher price.
The nice thing was that the strips were broken down into four 2’ strips with connectors, power supply and a remote control. The strips have an adhesive tape on the back making installation easy. While the light color does not match the rest of the layout, it was an easy answer to complicated problem. I could have used the under cabinet fluorescent lights that I used on the rest of the layout, but installation would be difficult and added weight to the upper swing bridge. Below are a few photos to illustrate the results. First a before and then an after. The before shot has been lighten up for more detail. It really looks darker in person. I ended up only using 3 of the 4 strips. The light produced by just three strips did the job very well. Now to work on hiding the “sun light” in the tunnel.
Layout Update - #13
Another Rolling Stock Update
One of the industries on the NML is Fergus Gravel just outside of Geraldine on the way to Falls Yard. This industry loads hoppers and gondolas with ballast, rip-rap and other grades of gravel for various uses.
The gravel pit is actually off the layout and accessed by a road that will go from the ramp to the edge of the layout. I have always liked the empties-in and loads-out part of operations. The only way to make it work realistically enough is with removable loads. Time to build some loads!
Removable Loads for Cars
After searching local hobby shops and the internet, I have not been able to find ready to use loads that have the look I want. Then it hit me! The NML uses ballast pulled from the Fergus Gravel pit. The loads should have a similar look also. I created the loads using the most common method that most modelers use. A pink foam base covered with your favorite material. While the one photo below with the load sitting on top of the car shows a lot of pink foam, once it sits down in the car it doesn’t show.