Sunday, October 3, 2010

Layout Construction – July - August 2010

New Scenery
After getting the itch to start some scenery work, I reworked the the track going into the first tunnel. I did not do a very good job of laying the track correctly the first time. So before any scenery could be started the track had to be redone properly.
With that done, it was now time for a new aspect of the layout to begin. I found some tunnel portals that I liked. There are not an exact replica for the tunnels used by the Milwaukee Road, but are close enough for my tastes. The portal entrance side walls also help to give the feel of the real thing. Now it was time to shape the hillside and begin sculpting the earth. Wow, sounds like I’m playing God.


082310 002
082310 023 082310 013


Lewistown Yard Tracks
With the basic land forms in place, I turned my attention to finishing the yard tracks and industrial siding in Lewistown. This completes all the track laying for the lower level. Time to run trains!


082410 012 082410 016


Grain Terminal Association’s Elevator
Now that the industrial track for Lewistown is in I needed to start working on some the industries. I had built the Walthers ADM Grain Elevator kit 4 or 5 years ago. It sat on the shelf waiting for the day it would be placed on a layout. The only problem was the fact the building was to tall and to wide for the lower level. After cutting done the main building and splitting the silos in half it fit just fine. The only left to do is add the roof and pipe housing to the top of the silos. Add some other small details and paint.


082310 015 082310 018


New Furnace
All layout work came to a sudden halt. It was time to replace the furnace. The furnace was the original equipment with the house. After serving faithfully for almost 25 years it was time to retire it. This allowed us to replace it with a modern energy efficient furnace with central air. The lower level of the house had never been cooled during the summer months. Plus, I was tired of fighting the swamp cooler every year.
The base work for the helix had to be removed and all the clutter in the corner had to find a new home. The ceiling tiles had to be removed for the addition of new cooling pipes and electrical work. So the layout was tidied up and a layer of protective plastic was used to cover everything for construction dust. Everything went well. As you can see in the last photo the installer did a great job of keeping everything inside the equipment closet.


081110 003 081110 002
080510 001 080510 004
081110 001


Additional Scenery Work
Now that the major house maintenance was complete it was time to get back to work. I finished sculpting the landforms in the corner of the layout. A quick coat of paint to blend everything and then sometime to view the results before continuing on.


082410 006 082410 008
082410 009

1 comment:

  1. So when is the helix going back up? Also, make sure you post pics of the painted silos. I really like the way you paint the buildings.

    Mat

    ReplyDelete