Layout Construction – Update #2


Falls Yard Update
Additional turnouts have been constructed to complete the mainline, passing and grain elevator siding along with the first yard track. I installed an additional crossover before the staging tracks to facilitate longer trains coming from or going into staging. In the last photo on the bottom right you can see the staging tracks have been placed on a removable section. While this section is not required to be removed to gain access to the crawl space, it will make it easier to move boxes in and out.

Click on the photos to enlarge them.