Saturday, February 6, 2010

Layout Construction – December 2009

December was a busy month with my Mom’s funeral and Christmas. My mom’s burial in Lewistown gave me a chance to see parts of the Northern Line of the Milwaukee.

Lewistown Depot (Yogo)-1940
This is a view of the Lewistown depot around 1940. The depot was closed after the last passenger train ran in August of 1955. The depot was purchased by the Lewistown Community Hotel Company in 1963 and renovated to become part of the Yogo Inn. The depot was constructed in 1913 as part of the expansion of the Milwaukee Road into northern Montana. A 137 miles of track was laid to Great Falls in 1914.
The time frame I am modeling of the Northern Montana line, the depot should be the Yogo Inn. This structure has so much interesting detail, I will be modeling it as a depot. The opportunity to be in Lewistown gave me the chance to photograph the detail not visible on the photo above. Her are some of the photos I captured of the detail.

LewisDepotLewisDepot_1 

LewisDepot_2LewisDepot_4
 
This my interpretation of the depot I will be building. The structure will be shorten to fit the layout better as the original structure is too large.


LewistownStation

In Remembrance of Bette Luther – November 25, 2009

Mom_Luther
Sadly one of my best friends past away just before Thanksgiving day. My mother was one of my greatest supporters in my life. Always encouraging my brother and I to do our best. Here is an excerpt from here obituary.

Bette June Luther, formerly of Great Falls passed away on Nov. 25, 2009 at Vintage Suites in Billings from complications caused by Alzheimer's . She was born on Feb. 6, 1930 near Martinsdale, MT to Oliver and Jeannie (Dalgarno) Feeback. She attended elementary school in Martinsdale and graduated from White Sulphur Springs High School in 1948. In 1949 she married Donald Luther in Moore, MT. They lived in Livingston briefly before moving to Great Falls where she lived most of her life. In 2007, she moved to Billings to be closer to family.

I would encourage memorial donations that can be made on her behalf to the Alzheimer's Association, 3010 11th Ave. No., Billings, MT 59101 or Rocky Mountain Hospice, 2110 Overland Ave., Suite 111; Billings, MT 59102.

She will be greatly missed by all!

Sunday, November 29, 2009

Layout Construction - November 23, 2009

Tunneling the Hill
I decided to take a break from building turnouts. I’ve completed the three so far and the newest one is better then the one built before it. My soldering technique and building time are getting faster. I thought it was time to build the half tunnel wall between Denton and Lewistown. I tried using aluminum flashing thinking it would curve easy and maintain that curve without support. Well, that didn’t quite work out. The aluminum was very hard to work with over the 39” length of the tunnel. I opted to use poster board and foam core supports.


112309 001  112309 004


The top edge started to become wavy without support. That did not seem to matter since the bottom of the ravine floor flatten out the waviness.


112309 009 112309 032


Next came the fun part of ballasting the track. This had to be done since access will be very restricted after the ravine floor is installed. Here is a before and after of the track.


112309 028 112909 017


This a artistic rendition of what the area will look like after the bridge, scenery and fascia is installed.

 112309 012a

Wednesday, November 11, 2009

Layout Construction - November 11, 2009

 
Now that the roadbed is starting to go down, it is time to begin building turnouts. I have hand built turnouts in the past and decided to give it a try again. After doing a lot of research on building turnouts, I decided that the method described by Joe Fugate would be the best method. This method has been posted on Joe’s Siskiyou Lines website. He uses Central Valley tie strips and printed circuit board ties. I won’t go into the construction explanation in this blog. Here is a link to his forums where he describes how to build a turnout. (Click Here) This method is  definitely easier then the way I have done it in the past.

111109 005111109 003

These turnouts shown below were built off the layout on a template and used the “fill the frog and guard rail with solder, then use a saw blade to clean everything out” method. This worked, but did not create a smooth turnout. I will provide more photos after the new turnouts are installed.

052109 017 052109 021052109 022

Tuesday, November 10, 2009

Train Show - November 7, 2009

How to Empty a Wallet
We attended the Utah NMRA show at the Utah State Fairgrounds. This was one of the largest shows they have had in years. There were lots of layouts and vendors to choose from. Picked up a few cars to add to the collection and metal wheels to replace some of the plastic sets that come with kits. Overall, a very enjoyable show with lots to see.

110709 070

110709 068 110709 041

110709 044 110709 046

110709 048 110709 059

110709 062

A few of the goodies collected from the show.

1c5d_1 b2ae_1

Layout Construction - October 31, 2009

Back to the Track Gang
The next project after our vacation was to finish gluing down the roadbed in the Lewistown area. I made a slight variation from the original track plan. The industrial spur and storage tracks were moved closer to the front of the layout. I did this after seeing the tight space for reaching back and re-railing cars. It will also allow more room for industries in that area.

110109 041

110109 043 110109 047

Wednesday, November 4, 2009

Vacation Time - October 23-30, 2009

Back to the Bridge
It was time for our annual vacation to a time share condo in Island Park, Idaho. I did not get any work done on the layout, but I worked on the plans for the trestle over the middle of the layout. I will create the bridge abutments for each end.

bridge1

This a Google Sketch 3D view of how the bridge abutment and small section of the trestle will look. I placed a figure to try and give a representation of the size of the trestle.

bridge2

We saw a few Montana Rail Link trains while traveling to Billings, Montana to visit with family. We were not able to stop and photograph them. We did stop in Bozeman and shoot a few photos of the old Northern Pacific depot there.

102609 002

102609 004 102609 005

West Yellowstone
This is the Union Pacific depot in West Yellowstone and a friend that we found while in the park.

102909 002 102909 003

102909 006 102909 028

Saturday, October 31, 2009

The Layout Plan

THE OVERALL PLAN
I should take the time and show the plan for the layout. It will be a two level around the wall type layout. The upper (Falls Yard) level is 55" from the floor and the lower (Lewistown) level is 40 3/4" off the floor. A helix will join the levels at the far end. Removable staging tracks are located at the opposite end of each level for the off-loading of trains. Along with Milwaukee trains, the layout will also have Great Northern trains passing over the line on a run through while their line to Billings is being repaired.

fallslevel

lewistownlevel

THE UPPER LEVEL (Falls Yard/Geraldine)
This level will be represented of the line from Great Falls to Geraldine. The Falls Yard will be a terminus for all Milwaukee Road trains. Great Northern trains will not stop and pass on to staging tracks to simulate their terminus at the Great Northern yards off the layout. At Falls Yard switching will include trains bound for Harlowton and point east or west on the Milwaukee mainline. Trains will also be made up to exit the staging to represent movement further up the branch to Agawam. Switching in this area includes a large grain elevator, fuel oil depot, freight house, farm implement dealer and team track.

fallsyard

geraldine

The station at Geraldine will include a grain elevator and stock yards. The track has been extended to have an area for storage (M.O.W. or other cars). At the far end the is a loading ramp that was thought to be gravel or some other bulk material. After some investigation by the members of the Yahoo Milwaukee Group, it turns out the original ramp was used in the early years as a way farmers to dump their grain into boxcars. (See photos below). I will continue with the original plan and use it as a gravel loading ramp.

bc48 KolarsdumpingwheatintoboxcaratJo-1

THE LOWER LEVEL (Lewistown/Denton)
This level will be the incoming trains from Harlowton and out bound trains to Great Falls. A small holding yard will store a minimum of cars to be switched at the local industries. These industries include a large grain elevator, freight house, brewery and flour mill. A siding will represent the branch line to the gypsum plant at Heath (See photo below). A major part of the Lewistown area to be modeled will be the beautiful station that is now the Yogo Inn.  Here is a photo from years ago.

lewistown

Lewistown Depot (Yogo)-1940 Heath Gypsum Plant--1986

The town of Denton will be a standard railroad town for the state of Montana. A grain elevator and stock yards are about all that existed on most small towns on the Northern Milwaukee line. This town will be used as a passing siding for east and west bound trains.

dentonlevel

THE HELIX (Connects both levels)
This is the helix that will connect both levels.

Helix

Wednesday, October 21, 2009

Layout Construction - October 18, 2009

Time to Lay Some Track
I received an box of cork roadbed from http://www.modeltrainstuff.com/. Now it was time to begin laying out the track plan on the foam. I started on the Lewistown area since I had placed roadbed from the tunnel the previous day.

101809 002

This is after a few hours work. While starting on the roadbed, I decide to alter the track plan a little. The industrial siding and yard tracks were moved closer to front for easier access. No track in place yet.

101809 009

Before finishing for the day, I decided to test fit the trestle bents to see how much modification was going to be needed. Looks like I will have some work to adjust the height of each tower.

101809 004